G/A "LYCEUM" SYNERGY"
Reconstruction of a concrete pool at a boarding school for children with scoliosis.
Concrete overflow type pool
Size 25.00 × 14.00 × 1.00-3.90 m
Facing of the bowl - liner
Commissioned in 2020.
The following work was performed
- installation of new embedded elements and pipeline
- installation of technological equipment
- facing of the pool bowl with a liner
The pool has:
- Sand filtration
- UV disinfector
- Water heating (heat exchanger)
- Reagent control and automatic dosing station (pH, Cl, algicide, coagulant)
Additionally:
Cleaning the pool is carried out by a robot vacuum cleaner Aquabot Magnum