G/A "LYCEUM" SYNERGY"

Reconstruction of a concrete pool at a boarding school for children with scoliosis.

Concrete overflow type pool

Size 25.00 × 14.00 × 1.00-3.90 m

Facing of the bowl - liner

Commissioned in 2020.

The following work was performed

  • installation of new embedded elements and pipeline
  • installation of technological equipment
  • facing of the pool bowl with a liner

The pool has:

  • Sand filtration
  • UV disinfector
  • Water heating (heat exchanger)
  • Reagent control and automatic dosing station (pH, Cl, algicide, coagulant)

Additionally:

Cleaning the pool is carried out by a robot vacuum cleaner Aquabot Magnum