Osokory Resort & SPA

Construction of a Public Concrete Pool
Year of Construction Start – 2023
Size: 15.00 × 8.00 × 0.8 - 1.50 m
Facing of the Bowl - PVC Liner

Commissioned in 2024.

 

Reconstruction of a Public Concrete Pool
Dimensions: 25.00 × 8.00 × 0.80 - 1.20 - 1.65 m
Cladding - PVC Liner

Commissioned after reconstruction in 2024.

The following work was performed:

  • development of an individual pool project
  • preparatory building work (filled with crushed stone, manufactured concrete base, сonstruction of a swimming pool bowl)
  • installation of embedded elements of the filtration and piping system
  • plastering of the bowls
  • facing of the bowl with a liner and the side with side stone
  • installation of filtration equipment and attractions

The pool has:

  • sand filtration
  • UV disinfector
  • automatic water top-up system
  • chemical dosing and control station
  • LED Lighting
  • attractions: hydromassage and large waterfall
  • control panel and equipment protection

Reconstruction of the public concrete pool

Size 25,00 × 8,00 × 0,80 - 1,20 - 1,65 m

Facing of the bowl – liner

Commissioned after reconstruction in 2024.

 

The following construction and repair works have been completed:

  • dismantling of the pool bowl and edge cladding, embedded elements, and piping
  • installation of embedded elements of the filtration and piping system
  • repair of a reinforced concrete swimming pool bowl
  • leveling the pool bowl and edges
  • facing of the bowl with a liner and the side with side stone
  • modernization of filtration equipment and attractions

The pool has:

  • sand filtration
  • UV disinfector
  • chemical dosing and control station
  • automatic water top-up system
  • LED Lighting
  • attractions: mushroom and waterfall
  • control panel and equipment protection