Swimming Pool at Park Hotel “Golden Beach”

Year of construction: 2023–2024
Total Pool Area: 1800 m²
Facing of the pool bowl - liner, facing of the side - side stone

Commissioned in 2024

The following work was performed:

  • Installation of embedded elements and piping
  • facing of the bowl with a liner and the side with side stone
  • Installation of filtration equipment
  • Pool heating system installation

The pool has:

  • Sand filtration
  • Automatic water top-up system
  • Chemical dosing and control station
  • LED lighting
  • Control panel and equipment protection

WE ARE EXPERTS IN OUR BUSINESS!

Confidence in contractors is the most important selection criterion
in cooperation with Aquasphere company.

TOP
Instagram Telegram Viber